Documented Results from Use
•96% improvement of NiCAD battery on satellites (JPL/ NASA)
•10% size reduction,
80% development time reduction and 20% cost reduction in design of a choke for a microwave oven (L.G. Electronics)
•$50,000 annual cost savings in design of heat staking process (Ann Arbor Assembly Corp)
•60% reduction in mean
response time for computer system (Lucent)
•$900,000 annual savings in the production of sheet-molded compound parts (Chrysler)
•$1.2M annual savings
due to reduction in vacuum line connector failures (Flex Technologies)
•66% reduction in variability in arrival time and paper orientation (Xerox)
•90% reduction in
encapsulation variation (LSI Corp)